Haul Route Crossing Systems
Perfect for major schemes and projects, allows heavy plant to move around safely and efficiently across public highways and bridleways.
A major contributor to the building of the Aberdeen bypass in 2015 to 2018.
Multiphase Adaptive Detection System (ADS) Compatible
Key Features and Benefits

Freely-configurable program
The system is simple to configure, radio-linked and capable of up to 8 phases, complete with on/off timer programmable functionality indluding automatic on/off program.

Part time signals
Capable of being set as part time signals allowing your operator to configure the signals to switch off and then back on at pre-set times as appropriate (up to 4 times a day)

Day-night/weekend programs
Provides the flexibility to set up to 6 different max times for each phase for the demands at different times of day.

Remote monitoring
A remote monitoring facility allows you to see the status of the signals (red or green) from your PC or phone. You can also monitor the battery voltage

CCTV
If required, there is the option of having CCTV mounted on the system.

Perfect for large developments
The system is specially designed to work well in large workplace developments such as the HS2 development.

Main Drag Priority
The system can be set to have the main drag on permanent green until a VA is activated on a side road. This is with ELC or EM.

Longer life
The systems batteries can last 14 days due to them having 6 in each box.

Handset control
The system can be remotely controlled using a handset by an on-site operative being able to control the system from a safe distance away from the crossings.

Variable Signal Head heights
The systems heads can be set at different heights to accommodate different vehicles